Management > EXAM > OPS 571 Final Exam ALL ANSWERS 100% CORRECT SPRING FALL-2022 SOLUTION GUARANTEED GRADE A+ (All)

OPS 571 Final Exam ALL ANSWERS 100% CORRECT SPRING FALL-2022 SOLUTION GUARANTEED GRADE A+

Document Content and Description Below

1. Which of the following is considered a major process flow structure? • Lead Time • Fabrication • Lean Manufacturing • Project 2. ISO audits result in certifications that are done by fi... rst, second, or third parties. Which of the following result in the best certification of a firm? • Certification is sought by any firm assuming they pay annual dues. • 2nd Party – where a customer audits its supplier • 3rd Party – where a qualified national or international standards/certifying agency serves as an auditor • 1st Party – where a firm audits itself against ISO standards 3.Which of the following is ISO 14000 primarily concerned with? • Quality management • Time management • Continuous improvement management • Environmental management 4. Which is the one correct value stream principle? • Look for efficiencies in the factory, office, physical, procedural, and technical operations. • Eliminate waste that stops, slows down, or diverts the value stream. • Concentrate on speeding up value-adding operations rather than removing waste. • Keep the value stream moving at minimum velocity. 5. What is the starting point in developing a capacity plan for a health care operation? • Determining the effective capacity over time • Estimating design capacity • Forecasting patient demand for a reasonable length of time • Discovery of the bottleneck operation 6. Which of the following is considered an organizational blueprint, which prescribes the quantity and time frame for when each end product will be assembled? • MRP (Material Requirements Plan) • ERP (Enterprise Resource Planning) • MPS (Master Production Schedule) • WBS (Work Breakdown Structure) 7. Which of the following is an element that addresses elimination of waste under lean production? • Kanban production control system • Production ahead of demand • Minimized run times • Group plant loading technology 8. In most cases, demand for products or services can be broken into several components. Which of the following is considered a component of demand? • Level elements • Future elements • Past elements • Cyclical elements 9. Design for manufacturing and assembly delivers product improvements by emphasizing which of the following: • Reducing product quality during the assembly process • Designing products so they can be manufactured by a virtual factory • Reducing equipment in the production process • Simplification of the product by reducing the number of separate parts 10. Which of the following is one of the principles of reengineering? • Quality at the source • Do not select suppliers on the basis of price alone. • Have those who use the output of a process perform the process. • Leverage high cost employees with lower cost employees. [Show More]

Last updated: 1 year ago

Preview 1 out of 6 pages

Reviews( 0 )

$10.50

Add to cart

Instant download

Can't find what you want? Try our AI powered Search

OR

GET ASSIGNMENT HELP
42
0

Document information


Connected school, study & course


About the document


Uploaded On

Jul 11, 2022

Number of pages

6

Written in

Seller


seller-icon
Allan100

Member since 3 years

18 Documents Sold


Additional information

This document has been written for:

Uploaded

Jul 11, 2022

Downloads

 0

Views

 42

Document Keyword Tags

Recommended For You


$10.50
What is Browsegrades

In Browsegrades, a student can earn by offering help to other student. Students can help other students with materials by upploading their notes and earn money.

We are here to help

We're available through e-mail, Twitter, Facebook, and live chat.
 FAQ
 Questions? Leave a message!

Follow us on
 Twitter

Copyright © Browsegrades · High quality services·