Management > EXAM > OPS 571 Final Exam ALL ANSWERS 100% CORRECT SPRING FALL-2022 SOLUTION GUARANTEED GRADE A+ (All)
1. Which of the following is considered a major process flow structure? • Lead Time • Fabrication • Lean Manufacturing • Project 2. ISO audits result in certifications that are done by fi... rst, second, or third parties. Which of the following result in the best certification of a firm? • Certification is sought by any firm assuming they pay annual dues. • 2nd Party – where a customer audits its supplier • 3rd Party – where a qualified national or international standards/certifying agency serves as an auditor • 1st Party – where a firm audits itself against ISO standards 3.Which of the following is ISO 14000 primarily concerned with? • Quality management • Time management • Continuous improvement management • Environmental management 4. Which is the one correct value stream principle? • Look for efficiencies in the factory, office, physical, procedural, and technical operations. • Eliminate waste that stops, slows down, or diverts the value stream. • Concentrate on speeding up value-adding operations rather than removing waste. • Keep the value stream moving at minimum velocity. 5. What is the starting point in developing a capacity plan for a health care operation? • Determining the effective capacity over time • Estimating design capacity • Forecasting patient demand for a reasonable length of time • Discovery of the bottleneck operation 6. Which of the following is considered an organizational blueprint, which prescribes the quantity and time frame for when each end product will be assembled? • MRP (Material Requirements Plan) • ERP (Enterprise Resource Planning) • MPS (Master Production Schedule) • WBS (Work Breakdown Structure) 7. Which of the following is an element that addresses elimination of waste under lean production? • Kanban production control system • Production ahead of demand • Minimized run times • Group plant loading technology 8. In most cases, demand for products or services can be broken into several components. Which of the following is considered a component of demand? • Level elements • Future elements • Past elements • Cyclical elements 9. Design for manufacturing and assembly delivers product improvements by emphasizing which of the following: • Reducing product quality during the assembly process • Designing products so they can be manufactured by a virtual factory • Reducing equipment in the production process • Simplification of the product by reducing the number of separate parts 10. Which of the following is one of the principles of reengineering? • Quality at the source • Do not select suppliers on the basis of price alone. • Have those who use the output of a process perform the process. • Leverage high cost employees with lower cost employees. [Show More]
Last updated: 1 year ago
Preview 1 out of 6 pages
Connected school, study & course
About the document
Uploaded On
Jul 11, 2022
Number of pages
6
Written in
This document has been written for:
Uploaded
Jul 11, 2022
Downloads
0
Views
42
In Browsegrades, a student can earn by offering help to other student. Students can help other students with materials by upploading their notes and earn money.
We're available through e-mail, Twitter, Facebook, and live chat.
FAQ
Questions? Leave a message!
Copyright © Browsegrades · High quality services·