Engineering > EXAM > PJM Generation Operation Exam - Questions and Answers (All)

PJM Generation Operation Exam - Questions and Answers

Document Content and Description Below

PJM Generation Operation Exam - Questions and Answers Control center facilities must have a minimum of how many days of fuel for the backup generator? 5 days If PJM ACE shows overgeneration, actual ... imports are: Less than scheduled Who should a generator contact at PJM to clear an outage ticket? Master Coordinator To correct for a slow or fast clock, system frequency schedules are offset by: +/-.02 Hz What frequency would PJM set to correct for fast-time error? 59.98Hz What frequency would PJM set to correct for slow-time error? 60.02Hz What info is on an instantaneous reserve check? synchronized (regulating and non-regulating), quick start, secondary and beyond secondary reserves Generators must provide PJM with a realistic Reactive Capability Curve. This curve must have no less than __ points, and no more than __ points. No less than 2 and no more than 8 points A classic indicator of voltage instability is when system voltages change greatly when... system loads change by a small amount Above the line of a D-curve... Lagging (pushing VARs). Generators will be set there during high-load/low voltage conditions. Below the line of a D-curve... Leading (absorbing VARs). Generators will be set there during low load/high voltage conditions. MWs and MVARs have what kind of relationship? Inverse (increase in MW = decrease in MVARs) How often do generators need to test reactive power capability? Every 5 years The computer hardware and software at each control center shall achieve an availability level of what for those reliability functions directly affect the successful operation of PJM? 99.95% What is EHV? Extra high voltage. Classified as 345kv and above Any generator that is a PJM generation capacity resource that has an RPM Resource Commitment: 1. Must submit an offer schedule into the DA market even if it is self-scheduled or unavailable due to outage 2. Generation capacity resources shall submit: -A schedule of availability for the next seven days -May submit non-binding offer prices for the days beyond the next Operating Day What time period is the Market Participant Bid/Offer Period? 0800-1100 What time are DA Market results posted? 1330 What time period is the re-bid period? 1330-1415 What is the maximum for a generation capacity resource offer? $2000/MWh [Show More]

Last updated: 1 week ago

Preview 1 out of 6 pages

Reviews( 0 )

$11.00

Add to cart

Instant download

Can't find what you want? Try our AI powered Search

OR

GET ASSIGNMENT HELP
10
0

Document information


Connected school, study & course


About the document


Uploaded On

Apr 19, 2024

Number of pages

6

Written in

Seller


seller-icon
Nurse Henny

Member since 1 year

4 Documents Sold


Additional information

This document has been written for:

Uploaded

Apr 19, 2024

Downloads

 0

Views

 10

Recommended For You


$11.00
What is Browsegrades

In Browsegrades, a student can earn by offering help to other student. Students can help other students with materials by upploading their notes and earn money.

We are here to help

We're available through e-mail, Twitter, Facebook, and live chat.
 FAQ
 Questions? Leave a message!

Follow us on
 Twitter

Copyright © Browsegrades · High quality services·