Construction and The Built Environment > QUESTIONS & ANSWERS > WELL AP Exam Questions (All)

WELL AP Exam Questions

Document Content and Description Below

WELL AP Exam Questions What are the 7 Concepts in the WELL Standard? - ✔✔Air, Water, Mind, Nourishment, Comfort, Light, and Fitness What are the 3 Project Types? - ✔✔- New and Existing Buil... dings - New and Existing Interiors - Core and Shell What does the New and Existing Buildings type address? - ✔✔It addresses the full scope of building design and construction, as well as operations. It can only be applied to buildings with a minimum of 90% of total sf occupied by owner. What does New and Existing Interiors type address? - ✔✔It addresses portions or the entirety of a building's interior space, unless going under major renovations. What does Core and Shell type address? - ✔✔It addresses the basic structure and shape of a building as well as HVAC systems and its water quality. Applies up to 25% of project area is fully controlled by building owner. At least 75% of the project space must be occupied by one or more tenants. How many preconditions and optimizations are in each project type? - ✔✔- New and Existing Building: 41 preconditions, 59 optimizations (100 total) - New and Existing Interior: 36 preconditions, 62 optimizations (98 total) - Core and Shell: 26 preconditions, 28 optimizations (54 total) What are the 6 Pilot Programs for the WELL Standard? - ✔✔- Multifamily Residential: have at least 5 dwellings - Educational facilities - Retail - Restaurant - Commercial Kitchens - Communities: Meet minimum occupancy, building size, and use requirements What human body systems are affected in WELL Standards - ✔✔Cardiovascular Digestive Endocrine Immune Integumentary Muscular Nervous Reproductive Respiratory Skeletal Urinary The WELL Building Standard is organized into ________ major categories of wellness called concepts. - ✔✔7 A feature is one of the _______ sections of the WELL Building Standard with a specific health intent. - ✔✔105 A(n) _______ is a requirement of a feature that dictates certain parameters or metrics to be met. - ✔✔Part The aim of the _____ is to promote the continuous advancement of WELL and allow project teams to achieve higher certification levels. - ✔✔Innovation Features A(n) ______ is a feature that is mandatory for all levels of WELL Certification - ✔✔Precondition A(n) _____ is an additional feature that can be used as a flexible pathway to achieve higher levels or WELL Certification. - ✔✔Optimization Many of the features in WELL were developed to have _____ with other green building and sustainability programs, such as LEED and USGBC. - ✔✔Synergy _____ between WELL Concepts and their features can affect aspects of building systems, such as increased energy use or increased building costs. - ✔✔Trade-offs The New and Existing Buildings project type can only be applied to buildings where a minimum of ______% of the total floor area is occupied by the building owner and is operated by the same management. - ✔✔90% The ______ project type addresses portions or the entirety of the building's interior space, unless the building is undergoing major renovations. - ✔✔New and Existing Interiors The Core and Shell project type can only be applied to buildings where up to _____% of the space is fully controlled by the building owner. - ✔✔25 Currently there are _____ WELL pilot programs available to projects that meet specific space types. - ✔✔6 List the number of features within each of the seven WELL Concepts, as well as the number of Innovation features. - ✔✔Air: 29 Mind: 17 Water: 8 Light: 11 Comfort: 12 Fitness: 8 Nourishment: 15 Innovation: 5 What are two examples of synergy between the WELL Building Standard and other green building and sustainability certification programs? - ✔✔One of the features in the Air Concept specifies that a percentage of the furniture in a project meet voluntary material reporting requirements, such as those in Imperative 10 of the Living Building Challenge 3.0. Another feature in the Air Concept has the same requirements for permanent entry walk-off systems as those found in one of the Indoor Environmental Quality (EQ) credits for the LEED v4 Building Design and Construction (BD+C) rating system What is an example of synergy between the Comfort Concept and Air Concept? - ✔✔When adjustable workstation chairs are specified to achieve ergonomic requirements for the Comfort Concept, chairs made from non-VOC-emitting materials can be specified to also increase the indoor air quality for the Air Concept List the three project types of the WELL Building Standard and the number of preconditions and optimizations that apply to each. - ✔✔New and Existing Buildings: (41 preconditions and 59 optimizations) New and Existing Interiors: (36 preconditions and 62 optimizations) Core and Shell (26 preconditions and 28 optimizations) List the six current pilot standard programs for the WELL Building Standard. - ✔✔Multistory Residential Retail Educational Facilities Restaurant Commercial Kitchen Communities What are the human body systems that the features of the WELL Concepts seek to protect by lessening the negative effects of the built environment? - ✔✔Cardiovascular Endocrine Reproductive Respiratory Nervous Skeletal Urinary Integumentary Immune Digestive How many features are included in the Water Concept? A. 8 B. 12 C. 15 D. 29 - ✔✔A. 8 A project team wishes to provide building occupants with the space and opportunity for an active lifestyle as well as encourage healthy eating habits that will enable that lifestyle. Which two WELL Concepts may have synergies between their features that the project team can use to implement this plan? A. Nourishment and Mind B. Fitness and Comfort C. Nourishment and Fitness D. Fitness and Mind - ✔✔C. Nourishment and Fitness The WELL project team for a soon-to-be constructed office building is looking at registering the project for the New and Existing Building project type. What does this project type encompass? A. The design of the building, but not the construction B. Major renovations of existing spaces C. The design and installation of the mechanical systems and window locations and glazing D. The full scope of project design and construction as well as aspects of building operations - ✔✔D. The full scope of project design and construction as well as aspects of building operations What is the minimum percentage of project space that must be occupied by one or more tenants in order for a project to qualify for the Core and Shell project type? A. 10% B. 25% C. 50% D. 75% - ✔✔D. 75% Which WELL Concept aims to minimize disruptions to the circadian rhythms of building occupants, enhance productivity, and improve physical energy and mood levels? A. Air B. Light C. Fitness D. Mind - ✔✔B. Light A(n) ______ is anyone who is affected by the construction and operation of a building, such as the project owners, company shareholders, building occupants, visitors, construction and maintenance personnel, and surrounding community. - ✔✔Stakeholders A project is WELL Certified ______ if it meets all applicable preconditions and less than 40% if the optimizations. - ✔✔Silver A(n) _____ is an intensive, multiparty workshop that brings people together to explore, generate, and collaboratively produce building design options. - ✔✔Charrette A(n) _____ is the individual who acts as project manager and oversees the WELL certification process. - ✔✔Project Administrator The ____ is an individual property owner, or a representative of the entity that owns the property, who is responsible for authorizing the registration of the project on WELL Online. - ✔✔Owner A(n) ____ is an independent professional who conducts on-site performance tests, inspections, and spot checks, as well as reviews documentation in order to evaluate a project's eligibility for WELL certification - ✔✔WELL Testing Performance Agent WELL Reviewers are not the same individual as the _______ on the project team. - ✔✔WELL AP Some features may require a separate ______ from the license professional who is overseeing the implementation of a specific feature. - ✔✔Letter of Assurance _____ include design drawings with highlighted information, operations schedules with time logs, policy documents and employee handbooks, and project narratives and balancing reports. - ✔✔Annotated Documents During ______, WELL Performance Testing Agent will conduct performance tests, visual inspections, and spot checks. - ✔✔Performance Verification A(n) ______ is an alternative solution for meeting he intent of a WELL feature. - ✔✔Alternative Adhesive Path (AAP) Once a WELL Reviewer issues the WELL report, the project owner has _______ calendar days to either accept the report as is, initiate a curative action plan to address unmet criteria as identified in the WELL report. - ✔✔180 Days`` A(n) _______ is a document that outlines a project team's disagreement with any finding of the WELL report or any decision regarding proposals for AAP, curative actions, or the Innovative features. - ✔✔Appeal Recertification for the New and Existing Interiors, New and Existing Buildings, and Core and Shell project types is mandatory within ___ years to ensure that these projects continue to perform according to the requirements of the WELL Building Standard. - ✔✔3 years Projects seeking certification for the Communities pilot program use the - ✔✔WELL Community Standard Because precertification is not available to WELL Community Standard projects, these projects should use the _______ designation that is awarded by the IWBI when all documents have been reviewed and approved. - ✔✔The Design Verified designation List the three components that compose the triple bottom line. - ✔✔- Social - Environmental - Financial A(n) ______ is a document that outlines strategies that the project team will employ to address unmet criteria as identified in the WELL Report. - ✔✔Curative Action Plan How does WELL Certification provide value? - ✔✔1. Can be used for marketing and branding opportunities. 2. Increase the productivity and employee retention which leads to healthier and happier employees. (Reduce costs) What are the levels of certification and the requirements in terms of preconditions and optimizations that can be achieved for the New and Existing Interiors, New and Existing Buildings, and Core and Shell project types? - ✔✔There are Silver, Gold, and Platinum levels. Silver: All preconditions and no optimizations. Gold: All preconditions and 40% of optimizations Platinum: All preconditions and 80% of optimizations. List the five basic steps of the WELL certification process. - ✔✔1. Registration 2. Documentation Requirements 3. Performance Verification 4. Certification 5. Re-certification and Documentation submission List the types of licensed professionals typically found on the project team for WELL certification. - ✔✔architects, interior designers, contractors, engineers, etc What is the primary duty of a WELL Reviewer in the WELL certification process? - ✔✔to verify that the features implemented in a project are documented and perform as intended. What is included in the WELL report that a project team receives after the WELL Performance Testing Agent has visited the project site and completed performance verification? - ✔✔Includes a feature by feature summary indicating whether the project team successfully provided documentation. What features in the WELL Building Standard are categorized as WELL organizational protocol? - ✔✔Features 65, 66, 90, 91, 92, 93, 94, 95, 96, and 98 are categorized as WELL organizational protocol. What is the level of certification achieved by a New and Existing Buildings project that has met all applicable preconditions and 60% of the applicable optimizations? A: 0% as it is unnecessary for Core and Shell performance verification B: 50% C: 75% D: 100%, since the Core and Shell project type addresses the whole building. - ✔✔B: 50% What is the second step in the timeline for the WELL certification process? A: Register the project through WELL online B: Assemble the project team for a charrette C: Submit the required documentation through WELL Online D: Have the WELL Performance Testing Agent visit the project site for performance verification - ✔✔C: Submit the required documentation through WELL Online The necessary documentation for a Core and Shell project has already been submitted, reviewed, and approved. What percentage of the project must now be occupied, at a minimum, before performance verification can be scheduled? A: 0%, as it is unnecessary to Core and Shell performance verification B: 50% C: 75% D: 100%, since the Core and Shell project type addresses the whole building - ✔✔A: 0%, as it is unnecessary to Core and Shell performance verification The WELL report for a New and Existing Buildings project indicates that the project has failed to meet the criteria for one of the applicable preconditions. After reviewing the report, the project owner determines that precondition had indeed been failed. What step can be taken to address the unmet criteria and reattempt the precondition? A: Submit an appeal B: Accept the WELL report as is for a lower level of certification C: Initiate a curative action plan D: Pursue an AAP - ✔✔C: Initiate a curative action plan How many months does a project have to complete the recertification process after sending in the recertification application? A: 3 B: 6 C: 9 D: 12 - ✔✔B: 6 [Show More]

Last updated: 8 months ago

Preview 1 out of 15 pages

Reviews( 0 )

$10.00

Add to cart

Instant download

Can't find what you want? Try our AI powered Search

OR

GET ASSIGNMENT HELP
103
0

Document information


Connected school, study & course


About the document


Uploaded On

Sep 05, 2023

Number of pages

15

Written in

Seller


seller-icon
Nutmegs

Member since 2 years

572 Documents Sold


Additional information

This document has been written for:

Uploaded

Sep 05, 2023

Downloads

 0

Views

 103

Recommended For You


$10.00
What is Browsegrades

In Browsegrades, a student can earn by offering help to other student. Students can help other students with materials by upploading their notes and earn money.

We are here to help

We're available through e-mail, Twitter, Facebook, and live chat.
 FAQ
 Questions? Leave a message!

Follow us on
 Twitter

Copyright © Browsegrades · High quality services·