WA UST Site Assessor > QUESTIONS & ANSWERS > WA UST Site Assessor Exam Questions and Answers 2023 with complete solution (All)
WA UST Site Assessor Exam Questions and Answers 2023 with complete solution What is the hold time for soil and preserved GW GRO samples? ✔Ans✔ 14 days Is an ICC certification needed to inst... all an AST? ✔Ans✔ No Flammability limits of gasoline ✔Ans✔ 1.4 to 7.6% How many days do you have from a tank closure to report/provide the UST checklist to ECY? ✔Ans✔ 30 days MTCA Method A lead CUL, soil ✔Ans✔ 250 mg/kg MTCA Method A lead CUL, GW ✔Ans✔ 15 ug/L Is the vadose zone saturated or unsaturated? ✔Ans✔ Unsaturated List in order of most mobile to least mobile: Bunker C, heating oil, diesel, gasoline ✔Ans✔ Gasoline, diesel, heating oil, Bunker C Is oxygenated gasoline more or less likely to dissolve in water? ✔Ans✔ More likely; fuel additives like MTBE are more soluble than gasoline Where to sample on dispenser? ✔Ans✔ 2 feet below where the piping enters the UST Where to sample along piping? ✔Ans✔ Every 50 linear feet and along joints/elbows How many GW samples are needed after decommissioning if a release to GW is confirmed, and where relative to the tank? ✔Ans✔ 3; 1 upgradient, 2 downgradient What vapor is an FID used to measure? ✔Ans✔ Methane What is a PID measuring? ✔Ans✔ Mixture of all volatiles What conditions might impede a PID? ✔Ans✔ Moisture/humidity, dust, transformers, power lines What UST capacity does not require a site assessment at closure? ✔Ans✔ Less than 110 gallons Purpose of a site check ✔Ans✔ To investigate a UST site for the presence of a release when evidence indicated that a release may have occurred Purpose of a site assessment ✔Ans✔ To investigate a UST site at the time of closure or change-in-service to determine if a release has occurred Site check vs. site assessment ✔Ans✔ A site check is an investigation of a UST site for a release when evidence indicates that one many have occurred; a site assessment determines if a release has occurred If a confirmed release is identified and reported within 24 hours, what is and is not required? ✔Ans✔ A site assessment is not required; a site characterization is required What is the historical date before which a UST system may have been permanently closed or abandoned that ECY may require a site assessment? ✔Ans✔ December 22, 1988 [Show More]
Last updated: 11 months ago
Preview 1 out of 8 pages
UST Bundled Exams Questions and Answers (2022/2023) Full Solution Pack Complete
By Crescent 11 months ago
$18
6
Connected school, study & course
About the document
Uploaded On
May 18, 2023
Number of pages
8
Written in
This document has been written for:
Uploaded
May 18, 2023
Downloads
0
Views
63
In Browsegrades, a student can earn by offering help to other student. Students can help other students with materials by upploading their notes and earn money.
We're available through e-mail, Twitter, Facebook, and live chat.
FAQ
Questions? Leave a message!
Copyright © Browsegrades · High quality services·