Army Explosive Safety Familiarization > QUESTIONS and ANSWERS > Explosive Safety Site Planning 2023 With 100% correct solutions (All)
ESQD arc - CORRECT ANSWER- PES > IMD > ILD > PTRD > IBD USATCES has submitted your ESSP for final approval. Who did they submit it to? - CORRECT ANSWER- DDESB What is the minimum distance permitted... between an ammunition or explosives location and the installation headquarters building? - CORRECT ANSWER- IBD What is the minimum distance permitted between a PES and an interstate highway? - CORRECT ANSWER- PTRD What is the minimum distance permitted between any two operating buildings and sites within an operating line? - CORRECT ANSWER- ILD What is the minimum distance permitted between an earth-covered magazine and a nearby above-ground magazine? - CORRECT ANSWER- IMD what requires DDESB approval? - CORRECT ANSWER- New PES ES within an existing ESQD arc physical mod to PES increasing the NEW ESSP doesn't exist for PES what doesn't require DDESB - CORRECT ANSWER- HD 1.4, group S ops less than 30 days 50lbs of HD 1.2.2 100lbs of HD 1.3 unlimited HD 1.4 policy older than 1958 no PES or ES built [Show More]
Last updated: 7 months ago
Preview 1 out of 4 pages
ARMY AMMO & EXPLOSIVE SAFETY FAMILIARIZATION EXAMS UPDATED 2023/2024 WITH QUESTIONS AND ANSWERS 100% CORRECT
By AMAZING GRACE 6 months ago
$20.5
12
Connected school, study & course
About the document
Uploaded On
Sep 30, 2023
Number of pages
4
Written in
This document has been written for:
Uploaded
Sep 30, 2023
Downloads
0
Views
26
In Browsegrades, a student can earn by offering help to other student. Students can help other students with materials by upploading their notes and earn money.
We're available through e-mail, Twitter, Facebook, and live chat.
FAQ
Questions? Leave a message!
Copyright © Browsegrades · High quality services·