Electrical Engineering > QUESTIONS & ANSWERS > NERC Transmission Practice Test Questions and Answers 100% Pass (All)
NERC Transmission Practice Test Questions and Answers 100% Pass Which type of relay operates on the premise of comparing the flow in and out of the area of protection? ✔✔Differential relay Und... erfrequency load shedding is set-up so that which of the following does NOT occur? ✔✔Uncontrolled separation Who is responsible to make sure that the operation of voltage control equipment is coordinated with other impacted entities? ✔✔Transmission Operator The coordination of voltage schedules by system operators would be utilized to reduce all of the following EXCEPT ✔✔Reactive inadvertent What should a system operator expect to see if the generator increases its excitation? ✔✔An increase in MVAR output A transmission line between Bus A and Bus B has MW flow from Bus B to Bus A. After the tripping of a parallel line, the line flow from Bus B to Bus A exceeds the lines thermal rating. Which of the following actions would assist the operator in correcting the problem? ✔✔Increase generation at Bus A What is a major concern for a System Operator during emergency conditions? ✔✔System remains connected to the Interconnection If your system has lost a large amount of customer load due to a system disturbance, but has remained connected to all of your neighbors, what is the best solution to consider? ✔✔Coordinate with the neighbors You report for work on a peak summer day with expected high temperatures and load. What can you do to maintain an adequate system voltage profile? ✔✔Get under the voltage by placing capacitors in service while maintaining operating limits If a Balancing Authority is unable to calculate ACE for more than _________ minutes it shall notify its Reliability Coordinator. ✔✔30 Your system configuration presents you with a situation of having two parallel lines between two stations. The lines have different ratings. Line A has a rating of 250 MVA, while line B has a rating of 200 MVA. Based on the line ratings, what is the first contingency transfer capability between the two stations? ✔✔200 MVA [Show More]
Last updated: 1 year ago
Preview 1 out of 3 pages
Instant download
Buy this document to get the full access instantly
Instant Download Access after purchase
Add to cartInstant download
NERC BUNDLED EXAMS QUESTIONS AND ANSWERS WITH VERIFIED SOLUTIONS
By Nutmegs 1 year ago
$16
9
Connected school, study & course
About the document
Uploaded On
Jan 14, 2023
Number of pages
3
Written in
This document has been written for:
Uploaded
Jan 14, 2023
Downloads
0
Views
85
In Browsegrades, a student can earn by offering help to other student. Students can help other students with materials by upploading their notes and earn money.
We're available through e-mail, Twitter, Facebook, and live chat.
FAQ
Questions? Leave a message!
Copyright © Browsegrades · High quality services·